<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Completed Projects &#8211; JS Infrastrusture Consultants</title>
	<atom:link href="https://jsicpl.com/projects_cat/completed-projects/feed/" rel="self" type="application/rss+xml" />
	<link>https://jsicpl.com</link>
	<description></description>
	<lastBuildDate>Thu, 04 Apr 2024 06:43:09 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.6.2</generator>

<image>
	<url>https://jsicpl.com/wp-content/uploads/2024/02/WhatsApp-Image-2024-02-14-at-12.16.21_feb92661-85x85.jpg</url>
	<title>Completed Projects &#8211; JS Infrastrusture Consultants</title>
	<link>https://jsicpl.com</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Project_005</title>
		<link>https://jsicpl.com/projects/project_005/</link>
		
		<dc:creator><![CDATA[dushyant_mishra]]></dc:creator>
		<pubDate>Sat, 30 Mar 2024 03:38:20 +0000</pubDate>
				<guid isPermaLink="false">https://jsicpl.com/?post_type=portfolio&#038;p=6423</guid>

					<description><![CDATA[Independent Engineer Services during Operation &#38; Maintenance Period for 4 laning of Kagal-Satara Section NH48 (Old NH-4) from Km 592.240 to Km 725.000 in the State of Maharashtra under NHDP Phase-I on BOT Basis]]></description>
										<content:encoded><![CDATA[
<p>Independent Engineer Services during Operation &amp; Maintenance Period for 4 laning of Kagal-Satara Section NH48 (Old NH-4) from Km 592.240 to Km 725.000 in the State of Maharashtra under NHDP Phase-I on BOT Basis</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Project_006</title>
		<link>https://jsicpl.com/projects/project_006/</link>
		
		<dc:creator><![CDATA[dushyant_mishra]]></dc:creator>
		<pubDate>Fri, 29 Mar 2024 03:46:16 +0000</pubDate>
				<guid isPermaLink="false">https://jsicpl.com/?post_type=portfolio&#038;p=6427</guid>

					<description><![CDATA[Independent Engineer Services during Operation &#38; Maintenance (O&#38;M) Period for 6 laning Project of Etawah (Km 323.475) to Chakeri (Km 483.687) Section of NH-2 (New NH19) on DBFOT basis under NHDP Phase-V in the State of Uttar Pradesh]]></description>
										<content:encoded><![CDATA[
<p>Independent Engineer Services during Operation &amp; Maintenance (O&amp;M) Period for 6 laning Project of Etawah (Km 323.475) to Chakeri (Km 483.687) Section of NH-2 (New NH19) on DBFOT basis under NHDP Phase-V in the State of Uttar Pradesh</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Project_007</title>
		<link>https://jsicpl.com/projects/project_007/</link>
		
		<dc:creator><![CDATA[dushyant_mishra]]></dc:creator>
		<pubDate>Thu, 28 Mar 2024 03:46:31 +0000</pubDate>
				<guid isPermaLink="false">https://jsicpl.com/?post_type=portfolio&#038;p=6429</guid>

					<description><![CDATA[Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (PKG- 3 Lot 6]]></description>
										<content:encoded><![CDATA[
<p>Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (PKG- 3 Lot 6</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Project_008</title>
		<link>https://jsicpl.com/projects/project_008/</link>
		
		<dc:creator><![CDATA[dushyant_mishra]]></dc:creator>
		<pubDate>Wed, 27 Mar 2024 04:58:44 +0000</pubDate>
				<guid isPermaLink="false">https://jsicpl.com/?post_type=portfolio&#038;p=6433</guid>

					<description><![CDATA[Consultancy Services for Feasibility Study and preparation of Detailed Project Report for KhalikoteKodala-Budhamba-Boirani- Koinphulia-Aska Road in the State of Odisha. (NH declaration Approved “In Principle”) (Length: 52 km)]]></description>
										<content:encoded><![CDATA[
<p>Consultancy Services for Feasibility Study and preparation of Detailed Project Report for KhalikoteKodala-Budhamba-Boirani- Koinphulia-Aska Road in the State of Odisha. (NH declaration Approved “In Principle”) (Length: 52 km)</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Project_009</title>
		<link>https://jsicpl.com/projects/project_009-2/</link>
		
		<dc:creator><![CDATA[dushyant_mishra]]></dc:creator>
		<pubDate>Tue, 26 Mar 2024 04:59:14 +0000</pubDate>
				<guid isPermaLink="false">https://jsicpl.com/?post_type=portfolio&#038;p=6435</guid>

					<description><![CDATA[Technical Support Consultancy (TSC) Services for Rural Connectivity Investment Programme under ADB Loan(Loan No. 2881-IND) in RCIPs States (Assam, Odisha, West Bengal, Chhattisgarh and Madhya Pradesh), Funded by Asian Development BankRCIP &#8211; 1 (Total Length: 13,697 Km.)Tranche 1, ADB Loan No. 2881, loan Amount 252 Ml doller, length 3859 km / Tranche 2, ADB Loan [&#8230;]]]></description>
										<content:encoded><![CDATA[
<p>Technical Support Consultancy (TSC) Services for Rural Connectivity Investment Programme under ADB Loan(Loan No. 2881-IND) in RCIPs States (Assam, Odisha, West Bengal, Chhattisgarh and Madhya Pradesh), Funded by Asian Development Bank<br>RCIP &#8211; 1 (Total Length: 13,697 Km.)<br>Tranche 1, ADB Loan No. 2881, loan Amount 252 Ml doller, length 3859 km / Tranche 2, ADB Loan No. 3065, loan Amount 275 Ml doller, length 3813 km / Tranche 3, ADB Loan No. 3306, loan Amount 273 Ml doller, length 6025 km<br>RCIP- 2 (Total Length: 12,000 Km.)<br>Tranche 1, ADB Loan loan Amount 250 Ml doller, length 6400 km<br>Tranche 2, length 5600 km</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Project_010</title>
		<link>https://jsicpl.com/projects/project_010/</link>
		
		<dc:creator><![CDATA[dushyant_mishra]]></dc:creator>
		<pubDate>Mon, 25 Mar 2024 05:06:28 +0000</pubDate>
				<guid isPermaLink="false">https://jsicpl.com/?post_type=portfolio&#038;p=6439</guid>

					<description><![CDATA[Conducting survey / Field work &#38; preparation of Detailed Social Impact Assessment (SIA) / Resettlement Action Plan (RAP) for Mumbai-Hyderabad High Speed Rail Corridor]]></description>
										<content:encoded><![CDATA[
<p>Conducting survey / Field work &amp; preparation of Detailed Social Impact Assessment (SIA) / Resettlement Action Plan (RAP) for Mumbai-Hyderabad High Speed Rail Corridor</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Project_012</title>
		<link>https://jsicpl.com/projects/project_012/</link>
		
		<dc:creator><![CDATA[dushyant_mishra]]></dc:creator>
		<pubDate>Sun, 24 Mar 2024 05:54:16 +0000</pubDate>
				<guid isPermaLink="false">https://jsicpl.com/?post_type=portfolio&#038;p=6487</guid>

					<description><![CDATA[Improvement of existing road of 2 laning with Hard Shoulders of 2 laning of Maram &#8211; Peren Section (Package IIA, Length &#8211; 16.840 km) from Design Chainage 40.000 km to 56.840 km on NH &#8211; 128A in the State of Manipur on EPC mode.]]></description>
										<content:encoded><![CDATA[
<p>Improvement of existing road of 2 laning with Hard Shoulders of 2 laning of Maram &#8211; Peren Section (Package IIA, Length &#8211; 16.840 km) from Design Chainage 40.000 km to 56.840 km on NH &#8211; 128A in the State of Manipur on EPC mode.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Project_013</title>
		<link>https://jsicpl.com/projects/project_013/</link>
		
		<dc:creator><![CDATA[dushyant_mishra]]></dc:creator>
		<pubDate>Sat, 23 Mar 2024 05:56:25 +0000</pubDate>
				<guid isPermaLink="false">https://jsicpl.com/?post_type=portfolio&#038;p=6491</guid>

					<description><![CDATA[Development of External Trunk Connectivity and Internal Infrastructure works as Multi Modal Logistic Park at Jogighopa in the State of Assam on EPC mode (Package-I, Road and Utility Works)]]></description>
										<content:encoded><![CDATA[
<p>Development of External Trunk Connectivity and Internal Infrastructure works as Multi Modal Logistic Park at Jogighopa in the State of Assam on EPC mode (Package-I, Road and Utility Works)</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Project_014</title>
		<link>https://jsicpl.com/projects/project_014/</link>
		
		<dc:creator><![CDATA[dushyant_mishra]]></dc:creator>
		<pubDate>Fri, 22 Mar 2024 05:58:36 +0000</pubDate>
				<guid isPermaLink="false">https://jsicpl.com/?post_type=portfolio&#038;p=6494</guid>

					<description><![CDATA[Strengthening work of in km 115, 122, 127, 128, 136, 137, 148 to 159, 182, 183, 188, 201 (Total length = 22.000 km) Sawai- Madhopur- Sheopur &#8211; Goras &#8211; Shyampur Section of NH &#8211; 552 Extn. In the state of MP on EPC mode]]></description>
										<content:encoded><![CDATA[
<p>Strengthening work of in km 115, 122, 127, 128, 136, 137, 148 to 159, 182, 183, 188, 201 (Total length = 22.000 km) Sawai- Madhopur- Sheopur &#8211; Goras &#8211; Shyampur Section of NH &#8211; 552 Extn. In the state of MP on EPC mode</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Project_015</title>
		<link>https://jsicpl.com/projects/project_015/</link>
		
		<dc:creator><![CDATA[dushyant_mishra]]></dc:creator>
		<pubDate>Thu, 21 Mar 2024 06:36:02 +0000</pubDate>
				<guid isPermaLink="false">https://jsicpl.com/?post_type=portfolio&#038;p=6499</guid>

					<description><![CDATA[Safety Consultant for the work of Stage Strengthening under Annual Plan for the year 2019-2020 from km 440/000 to 445/000 and km 500/000 to 510/000 (Total Length = 15.000 km) of NH &#8211; 52 (New NH 515) on EPC mode under Nagaon NH Division, Nagaon in the state of Assa, Job No. 515 (New/AS/2019-20/190]]></description>
										<content:encoded><![CDATA[
<p>Safety Consultant for the work of Stage Strengthening under Annual Plan for the year 2019-2020 from km 440/000 to 445/000 and km 500/000 to 510/000 (Total Length = 15.000 km) of NH &#8211; 52 (New NH 515) on EPC mode under Nagaon NH Division, Nagaon in the state of Assa, Job No. 515 (New/AS/2019-20/190</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
